Stage 1 of the Rangeville Community Church is underway on the corner of MacKenzie and Stenner Streets, Toowoomba. This article provides progressive images of its construction.
StruXi is the Project Superintendent. McNab Developments (Qld) Pty Ltd is the Builder.
(Our website also presents a case study of this soon-to-be community icon.)
- 06/09/10 – Inside the Youth Hall Auditorium
- 06/09/10 – Wall frames continue
- 30/08/10 – Blockwork & wall frames to multi purpose rms and boardroom zone
- 30/08/10 – Finishing concrete slab to Lobby
- 25/08/10 – Roof sheeting being loaded onto Lobby roof
- 16/08/10 – Ground slabs completed to Multi Purpose Rooms and Offices
- 09/08/10 – Portico front entrance takes shape
- 09/08/10 – Multi Purpose Rm slab poured (Youth Hall Auditorium in backgnd)
- 09/08/10 – Structural Steel to the Lobby roof
- 02/08/10 – Structural steel starts to Youth Hall Auditorium
- 26/07/10 – Blockwork, Boardroom and toilets (left), Offices (right)
- 19/07/10 – View through foyer to Picnic Point
- 16/07/10 – Erection of the Stage 1 tilt panels
- 12/07/10 – Tilt panels cast, awaiting erection
- 06/07/10 – Inground plumbing pipes and footings continue
- 28/06/10 – Casting the Stage 1 tilt panels
- 18/06/10 – 3x 95,000ltr ea inground tanks
- 18/06/10 – Bored Piers and Footings in background, Casting beds for tilt panels in foreground
- 15/06/10 – Building pad completed and boxing out of roads
- 31/05/10 – Clearing topsoil to building footprint
- 13/05/10 – A vacant, green fields site