$2.5M COCT Multi Use Hall completed
The Multi Use Hall at the Christian Outreach College Toowoomba reached completion in May 2011. This article provides progressive images of its construction. Landscaping is to be completed by the school.
StruXi was the Project Superintendent. G&K Lawson Constructions Pty Ltd was the Builder.
This project was delivered under the Building the Education Revolution (BER) program which was the largest element of the Australian Government’s Nation Building - Economic Stimulus Plan.
- 01/06/11 – View to end of hall
- 01/06/11 – View to upper level
- 01/06/11 – View to Stage
- 01/06/11 – Looking onto hall from upper foyer
- 01/06/11 – Upper Foyer
- 01/06/11 – East Facade
- 01/06/11 – North Facade
- 01/06/11 – West Facade
- 01/06/11 – South Facade
- 06/04/11 – Building Signage
- 28/03/11 – Lower pathway connecting to the existing school
- 24/03/11 – At upper level overlooking main hall and stage
- 01/03/11 – Pathways to the Back-of-Stage rooms
- 22/02/11 – Upper Foyer
- 15/02/11 – Pathways under construction
- 15/02/11 – Linemarking of courts in hall
- 01/02/11 – Laying of Sports Floor to main hall
- 25/01/11 – External painting to North facade
- 19/01/11 – Wall linings to upper floor Foyer & Balcony
- 10/01/11 – Open Channel in use during Toowoomba Floods
- 22/12/10 – Painting & roofing trades continue
- 16/12/10 – View from back-of-stage room
- 16/12/10 – Construction of Stage floor
- 29/11/10 – Batter cleaned up
- 23/11/10 – Framing to the upper level (future kitchen)
- 16/11/10 – Shaping the ground for overland flows
- 11/11/10 – Lights & Basketball Backboard to hall
- 09/11/10 – Roof goes on to upper classrooms
- 02/11/10 – Inground water tank
- 02/11/10 – View of the stage from the upper balcony
- 02/11/10 – Structure substantially completed
- 26/10/10 – Blockwork to the upper, external walkway
- 19/10/10 – Upper floor slab for 3rd & 4th classrooms & future kitchen
- 12/10/10 – Preparing slab to Back-of-Stage room
- 06/10/10 – Reinforcement to suspended slab
- 28/09/10 – Concrete sub-base for timber sports floor to Hall
- 28/09/10 – Structural Steel roof frame to upper Foyer
- 21/09/10 – Formwork to suspended concrete slabs continues
- 16/09/10 – Formwork to elevated walkway from top oval
- 14/09/10 – Formwork to upper floor
- 07/09/10 – Structural steel is completed to the main hall roof
- 31/08/10 – Structural steel commences. Looking at the stage within the hall.
- 31/08/10 – All tilt panels are stood
- 25/08/10 – Stage on left, Hall in middle, Classrooms / Toilets on right
- 25/08/10 – Erection of the tilt panels, blades to elevated walkway from top oval
- 17/08/10 – Preparation for casting last 2 concrete tilt panels
- 03/08/10 – Elevated walkway foundations
- 03/08/10 – Casting of tilt panels continue
- 27/07/10 – Blockwork to toilets and change rooms on gnd floor
- 27/07/10 – Casting of concrete tilt panels
- 20/07/10 – Hall (foregnd), Gnd floor learning areas & amenities (backgnd)
- 20/07/10 – Standing in a General Learning Area (GLA)
- 12/07/10 – Blockwork continues
- 07/07/10 – Foundations for elevated walkay from top oval
- 25/06/10 – Blockwork underway
- 17/06/10 – Strip footings completed, Casting beds for tilt panels in background
- 04/06/10 – Ingroung plumbing to Gnd Floor amenities
- 25/05/10 – Excavation for strip footings
- 13/05/10 – Installing bored piers
- 23/04/10 – Topsoil removed from Building footprint